Back to all articlesInstallation Advice

Preparing Your Property for Professional Fence Installation

Get ready for installation day with our checklist. Simple preparations that ensure a smooth, efficient installation process.

December 5, 20254 min read
Preparing Your Property for Professional Fence Installation

A well-prepared property makes for a faster installation, a cleaner yard afterward, and a better-looking final fence. Here's the exact checklist we send homeowners before their install day.

One week before installation

  • Confirm your property lines. If you don't have a recent survey, mark them clearly with stakes and string. Building a fence over the line is one of the most expensive mistakes a homeowner can make.
  • Notify your neighbors. Not required, but strongly recommended, especially if we'll be working near a shared property line.
  • Check for HOA rules. Many Michigan subdivisions have covenants on fence height, color, and style. Get any required HOA approval in writing.

Two to three days before

  • MISS DIG 811 will arrive to mark public utilities. Do not remove the paint or flags.
  • Mark private utilities yourself. Sprinkler lines, invisible dog fences, low-voltage landscape lighting, and gas lines to detached grills are not covered by MISS DIG. If we don't know they're there, we can't avoid them.
  • Trim vegetation along the planned fence line; at least 2 feet of clearance makes installation much faster.

The day before

  • Move patio furniture, planters, garden decorations, and grills at least 6 feet from the fence line.
  • Pick up any pet waste in the work area (your installers will thank you).
  • Confirm gate locations one more time; this is the most common last-minute change request.

Installation day

  • Keep pets indoors or on leash. Even friendly dogs can bolt when a gate is off its hinges.
  • Plan for one member of the household to be available for the initial walkthrough and any decisions.
  • Leave a spigot accessible; we may need water for mixing concrete.
  • If parking is tight on your street, consider moving cars out of the driveway so our crew can stage materials close to the work.

After installation

  • Give concrete footings 24–48 hours to fully cure before hanging anything heavy from the fence.
  • Water any disturbed grass to help it recover.
  • Take a walk around your new fence and note anything you want us to look at; we'd rather come back once for a small tweak than have you live with something that bothers you.

That's the whole list. We handle the heavy lifting; a little prep on your end keeps everything running smoothly. If you're getting ready for an install, or still shopping around, we're always here for a free estimate.

Ready for a free, no-pressure fence estimate?

Prime Fence has been serving Michigan homeowners since 2010. We'll walk your yard, answer every question, and put together an honest written estimate, with no upsells, no pushy sales.

Related Articles